A solar module manufacturer traces every panel from cell batch to installation site
Cell, glass and frame procurement, line-wise production, module serial traceability, DCR documentation and warranty claims on ERPNext for a solar PV module maker.
- of modules traceable to cell batch
- 100%
- of modules traceable to cell batch
- days to compile a DCR file
- 3 → 0.5
- days to compile a DCR file
- imported material held in stock
- −24%
- imported material held in stock
- production lines on one plan
- 4
- production lines on one plan
The client
Goldi Solar manufactures solar PV modules in Gujarat for utility-scale developers, EPC contractors and rooftop installers. Domestic content rules, long warranties and tight delivery windows mean every module has to be traceable to the materials that went into it.
The challenge
- ✕Module serial numbers lived in line software that was not linked to purchase or dispatch records.
- ✕Domestic Content Requirement (DCR) files for rooftop subsidy projects took days to compile from invoices and test reports.
- ✕Imported glass, backsheet and frames were over-ordered because consumption by line was not visible.
- ✕Warranty claims needed the original flash-test data, which took weeks to find.
The solution
Procurement and imports
Purchase orders, letters of credit, landed cost and customs duty for imported materials, with domestic cell sourcing tracked separately for DCR.
Line-wise production
Work orders per line with stringer, lamination, framing and flash-test stages, and material issue by batch.
Serial traceability
Each module serial linked to its cell batch, glass lot, flash-test result and dispatch, searchable in seconds.
DCR and dispatch documents
DCR declarations, packing lists, e-invoices and e-way bills generated from the same record.
Warranty claims
Installers log claims against a serial, with test data and site details attached for the quality team.
How we delivered
- 01Discovery with purchase, production, quality and sales, plus a review of DCR audit findings.
- 02Integration with line equipment exports for flash-test and EL images.
- 03One line taken live first, then the remaining three over four weeks.
- 04Hypercare through the first quarter-end close.
The results
- ✓Every module can be traced from cell batch to customer site.
- ✓DCR files are built in half a day instead of three.
- ✓Imported material held in stock fell 24%.
- ✓Warranty claims are assessed with test data on hand.
“Developers and auditors ask the same question: where did this module's cells come from? We answer it in seconds now.”