A recycled kraft paper mill moves off Tally and spreadsheets and costs every tonne it makes
Waste-paper buying, pulping, paper-machine production by reel, captive power and GST e-invoicing on ERPNext for a kraft paper and board mill.
- fibre cost per tonne of paper
- −11%
- fibre cost per tonne of paper
- BF, GSM & moisture on record
- Every reel
- BF, GSM & moisture on record
- days to close the month
- 8 → 2
- days to close the month
- e-way bills raised by hand
- 0
- e-way bills raised by hand
The client
Genus Paper & Boards makes kraft paper from recycled waste paper at its Moradabad mill, selling reels to corrugated box makers across North India. Fibre, steam and power make up most of the cost of every tonne, so yield and moisture control decide the margin.
The challenge
- ✕Waste paper was bought by truckload from dozens of dealers, with moisture and grade deductions argued over on paper slips.
- ✕Production was logged per shift in registers, so yield and machine downtime were only known at month end.
- ✕Accounts ran in Tally while stores, production and dispatch used separate spreadsheets.
- ✕E-invoices and e-way bills for hundreds of dispatches a month were keyed in on the government portal by hand.
The solution
Waste-paper procurement
Weighbridge entries, moisture tests and grade deductions recorded at the gate and posted straight to the supplier ledger.
Pulp-to-reel production
Shift-wise pulping, paper-machine runs and reel output with BF, GSM and moisture captured from the lab for every reel.
Cost per tonne
Fibre, chemicals, steam, power and labour allocated to each grade daily, so management sees margin by grade every morning.
Dispatch and GST
Reel-wise packing lists, e-invoices and e-way bills generated from ERPNext through the GST portal APIs.
Plant maintenance
Breakdown logs and preventive schedules for the paper machine, boilers and pulpers, with spares issued against each job.
How we delivered
- 01Two weeks on the mill floor mapping the gate, pulping, machine house, lab and dispatch.
- 02Tally masters and three years of ledgers migrated and reconciled to audited balances.
- 03Gate and lab modules launched first so procurement data was clean before costing went live.
- 04Shift-wise training for supervisors in Hindi, with super-users on every shift.
The results
- ✓Fibre cost per tonne fell 11% as moisture and grade deductions were applied consistently.
- ✓Month-end close dropped from eight days to two.
- ✓Every reel carries its lab results, so quality complaints are traced in minutes.
- ✓E-invoices and e-way bills are generated automatically with each dispatch.
“We used to learn our yield at month end. Now the shift supervisor knows it before handover.”