A precision injection moulder sees margin by mould, machine and customer
Mould-wise BOMs, machine scheduling, shot counting, export documentation and part-level costing on ERPNext for a precision plastics manufacturer.
- gross margin on repriced parts
- +6 pts
- gross margin on repriced parts
- machine changeover time
- −18%
- machine changeover time
- shot count and maintenance due
- Every mould
- shot count and maintenance due
- to go-live
- 12 weeks
- to go-live
The client
Shaily Engineering Plastics makes precision injection-moulded parts for global home-furnishing, consumer and healthcare brands from its plants in Gujarat. Most output is exported against long-term contracts, so resin price swings and machine utilisation decide margin.
The challenge
- ✕Part costs were estimated once at quotation and rarely revisited when resin prices moved.
- ✕Machine schedules were planned on whiteboards, causing frequent changeovers.
- ✕Mould shot counts and maintenance were tracked in registers on the shop floor.
- ✕Export documents were prepared separately from the sales order.
The solution
Mould and part masters
BOMs per part with resin grade, masterbatch, cavities, cycle time and machine tonnage.
Production planning
Machine-wise schedules that group parts by resin and colour to cut changeovers.
Mould maintenance
Shot counts captured per run, with preventive maintenance raised automatically at set intervals.
Costing and repricing
Actual part cost from resin, power and machine hours, compared against contract price each month.
Exports
Proforma invoices, packing lists, shipping bills and export incentive tracking from the sales order.
How we delivered
- 01Time studies on the shop floor to set accurate cycle times.
- 02Masters for 1,200 parts and 400 moulds cleaned and loaded before go-live.
- 03Shop-floor terminals at each machine bank for production entry.
- 04Monthly margin review set up with the finance team.
The results
- ✓Parts selling below cost were found and repriced, adding six points of gross margin on them.
- ✓Changeover time fell 18%.
- ✓No mould runs past its maintenance interval unnoticed.
- ✓Export documents come straight from the sales order.
“We found parts we'd been making at a loss for two years. The numbers were always there; now we can see them.”